IMTS 2024
Published

The Effect of Lot Size on Productivity

The more parts to be produced, the more elaborate the manufacturing process. Here are some other important considerations that can impact productivity.

Share

Understanding factors that contribute to your company’s identity, and addressing those that are most important to your company, will dramatically improve its CNC machine utilization. In past months, I have discussed company type, repeat business and lead time. This month, I am focusing on lot size, which I define as the number of workpieces produced during a single production run. 

Almost every process-related decision you make should begin with a simple question: “How many parts are we making?” The more parts to be produced, the more elaborate your processes can be. There will, however, be challenges throughout the entire lot-size spectrum. For this discussion, I define lot sizes as:

  • Extremely small (1-3 parts)
  • Small (3-20 parts)
  • Medium (21-100 parts)
  • Large (100-1,000 parts)
  • Extremely large (more than 1,000 parts)

Process Considerations

With smaller lot sizes and assuming program execution time is relatively short, no special consideration need be given to workholding or cutting tool selection. Just about any process that makes an acceptable workpiece will work. But as lot sizes grow, so does the need to reduce program-execution time while maintaining quality specifications. Any additional costs incurred because of a more elaborate process will be justified by the reduced time needed to complete the production run. With extremely large lot sizes, you should be able to justify anything it takes to get the last second out of the machining cycle.

Programming Considerations

With extremely small through small lot sizes, and especially when combined with short cycle times and few repeated jobs, offline programmers will not be able to keep up with production needs. If programming time is not internal to production run time, you should consider shopfloor-programmed (conversational) CNCs and having your CNC operators create programs during setup.

Engineering Considerations

The engineering I am thinking of here is related to making things easier for the setup person and operator: documentation and the like. The goal is to minimize mistakes and save time. With smaller lot sizes, and especially with limited repeat business, it may be difficult to justify much engineering past developing a machining process and creating rudimentary setup instructions. With minimal engineering, of course, the operator running the job must be highly skilled. (An exception is if you know the job will be repeated multiple times in the future, since the engineering time and effort can be justified over the part’s life.) 

As lot sizes grow, it is likely that more than one person will be involved with the production run (tool-crib attendants; setup people; first, second and third shifts; inspectors; and so on). In these cases, there is a much greater need for task-simplifying engineering. Additional documents could include more elaborate setup instructions that list components and their locations, process drawings that specify machining operations to be performed and control sheets that describe measurements to be taken along with the offsets needing adjustment. In addition to documentation, task-simplifying engineering can include any studies and actions that improve the way a job is run.

Setup and Cycle-Time Reduction Considerations

I define setup time as the period from running the last part in the previous production run to running the first (good) workpiece in the next production run. Cycle time (per part) is the total time it takes to run the rest of the parts divided by how many parts have been run. 

Given similar program execution times, machines will be in setup for a greater percentage of production run time when running smaller lots.  With very small lot sizes, for instance, it is not uncommon for setup time to far exceed the time required to run out the job. When trying to improve machine utilization given this scenario, you should first concentrate on setup time.

As lot sizes grow, the percentage of time a machine is in setup will shrink. With large and very large lots, setup may be but a small part of the production run. In these cases, it would be better to target cycle time for improvement. While you should concentrate on things that happen during every cycle, like program execution time, part load/unload, cleaning/deburring and so on, don’t forget about things that do not, like tool maintenance, sampling inspections and machine warmup. 

Personnel Utilization Considerations

The larger the average lot size, the more tasks that can be performed offline in preparation for upcoming jobs. As lot sizes grow, there comes what I call a break-even point when there is ample time for someone (probably not the setup person or operator) to do all of legwork needed for upcoming jobs. Setup-related tasks could include acquiring related documentation, gathering components and measuring devices, assembling cutting tools, and taking certain cutting tool measurements. Production-run tasks could include gathering resources to complete the run, like inserts, raw material and coolant. This will minimize the amount of work a setup person or operator must do while the machine is down. 

IMTS 2024
IMTS 2024
IMTS 2024
IMTS 2024
IMTS 2024

Related Content

Cutting Tools

Threading On A Lathe

The right choices in tooling and technique can optimize the thread turning process.

Read More
Measurement

Understanding Errors In Hand-Held Measuring Instruments

Different instruments (and different operators) are prone to different errors.

Read More
Basics

Understanding The Four Major Behavioral Styles

Companies today are expanding the role of teams in the workplace in an effort to empower employees and improve organizational effectiveness. The more we try to work as a team, the more important it becomes to recognize that people exhibit different behavioral styles.

Read More
Basics

6 Steps to Take Before Creating a CNC Program

Any time saved by skipping preparation for programming can be easily lost when the program makes it to the machine. Follow these steps to ensure success.

Read More

Read Next

Large Part Machining

The Cut Scene: The Finer Details of Large-Format Machining

Small details and features can have an outsized impact on large parts, such as Barbco’s collapsible utility drill head.

Read More

3 Mistakes That Cause CNC Programs to Fail

Despite enhancements to manufacturing technology, there are still issues today that can cause programs to fail. These failures can cause lost time, scrapped parts, damaged machines and even injured operators.

Read More
Supertec Machinery celebrates 70 years anniversary