Composite Applications Simulate Fiber-Placement Machinery
Version 7.1 of CGTech’s Vericut Composite Programming (VCP) and Vericut Composite Simulation (VCS) applications are designed to program and simulate automated fiber-placement machinery from various machine tool builders.
Version 7.1 of CGTech’s Vericut Composite Programming (VCP) and Vericut Composite Simulation (VCS) applications are designed to program and simulate automated fiber-placement machinery from various machine tool builders.
VCP reads CAD surfaces and ply boundary information and creates fiber-placement paths to fill the plies to user-specified manufacturing standards and requirements. “Batch” processing capabilities reduce the time required to make changes to one or more plies. Layup paths are linked together to form specific sequences and are output as NC programs for the fiber-placement machine.
VCS reads CAD models of the layup tool and fixtures and simulates the layup sequence directly from NC program files, either from VCP or from other composite layup path-generation programming applications. Tow material is applied to the layup form via NC program instructions in a virtual CNC-simulation environment. The simulated material applied to the form can be measured and inspected to ensure the NC program follows manufacturing standards and requirements. A report showing simulation results and statistical information can be created automatically.
Related Content
-
Fearless Five-Axis Programming Fosters Shop Growth
Reinvestment in automation has spurred KCS Advanced Machining Service’s growth from prototyping to low-and mid-volume parts. The key to its success? A young staff of talented programmers.
-
CAD/CAM System Requirements: An Overview
CAD/CAM programs are among the most demanding kinds of computer software. Smooth operation requires careful consideration of computer specifications.
-
TTI Brings Specialty Gear Production In-House with Multiaxis Machining
By investing in a 3+2-axis machine and utilizing simulation software for diagnostic checks, Techtronic Industries turned a four- to ten-week lead time into a one- to two-week lead time.