Parts Cleaning Conference
Animations of graphs in a High QA system Source: High QA
VIEW NOW

Automatically Generate PPAP/APQP Submission Requirements

June 08, 2023 |

Meet industry standards and your customer's quality requirements.

Are you a manufacturer in the aerospace, automotive, defense or medical industries trying to keep up with the ever-changing standards? Then don't miss this webinar where you can learn how to streamline and automatically generate your control plans, PFMEAs, gage R&Rs, SPC control charts, FAIs and other submission requirements.

As a manufacturer, you make parts for many customers. Each customer has their own quality requirements specifying the types of reports they would like to see submitted with each job or order you produce for them.

Keeping track of those requirements can be difficult and time-consuming. Join this webinar to learn how you can automatically generate a complete submission package—with your customers' specific quality requirements—in less than an hour.

Agenda:

  • Automatic ballooning of prints
  • Inspection plan generation
  • Manufacturing operations
  • Gage management
  • Automated CMM data import
  • Shop floor data entry tools
  • FAI creation
  • PFMEA generation
  • Control plan population
  • SPC with one click
  • Gage R&R integration
  • A fully paperless, database-driven solution that doesn't rely on Microsoft Excel
Presenter 1

Presenter 1:

Tim Hogan

Vice President of Business Development

Tim has been in and around manufacturing for almost 30 years, having worked for Tier 1 and Tier 2 suppliers and one of the leading providers of quality control equipment. Tim has a unique perspective on the topic having been on the shop floor, working with machinists and working in the quality lab—ranging from programming CMMs to working with customers on submission requirements.

All content on this page is provided by the presenting company.

IMTS 2024
Parts Cleaning Conference
CAMX 2024
Parts Cleaning Conference