Sodick Begins Construction of New U.S. Headquarters
The larger facility will be located in Schaumburg, Illinois.
Share
Machine tool manufacturer Sodick Inc. and its partners, the City of Schaumburg, Northern Builders and Harris Architects, have announced the beginning of construction on Sodick’s new U.S. corporate headquarters in Schaumburg, Illinois. The new 40,000-square-foot facility is to be constructed on a 5-acre lot and is scheduled be completed July 2017.
The new corporate headquarters will nearly double Sodick’s facility space and will include an additional loading dock to better accommodate increased sales volume. Additionally, the facility will have an expanded EDM showroom, engineering bay and a dedicated additive manufacturing technology center to house Sodick’s OPM line of metal 3D printers.
Related Content
-
Dielectric Oil Dramatically Reduces EDM Maintenance
Plagued by repeated small fires that interrupted its wire EDM throughput, this cutting tool manufacturer changed its dielectric oil and both eliminated fires and reduced its oil consumption.
-
MWI Introduces Wire EDM Consumables Designed to Maximize Energy Efficiency
Blac Technology’s specialized composition is designed to provide uniform distribution and embedding of particles throughout the surface.
-
MC Machinery EDM Offerings Provide Optimized Performance
MC Machinery’s Mitsubishi SG12 and MV2400 EDMs provide ergonomic and efficient operations.